Windsor Catholic Central High School is a new 2-storey secondary school with oversized student commons for multi-purpose uses, large double gymnasium and 21st Century learning spaces throughout designed to encourage collaboration.

This is the first Ontario high school designed to respond to a post-pandemic environment. The efficiency of the design resulted in the gross area of the school being 20% under the Ministry standards without compromising any of the program spaces. The Library area was kept to a minimum to allow a bigger student learning commons to be developed, which will facilitate physical distancing. By starting on site in late 2020, the contractor had 20 months to complete the project.